Crusoe
HSE Manager, Data Center Construction
On-siteFull-time
$129,000 to $157,000 a year
About the job
Crusoe is on a mission to accelerate the abundance of energy and intelligence. As the only vertically integrated AI infrastructure company built from the ground up, we own and operate each layer of the stack — from electrons to tokens — to power the world's most ambitious AI workloads. When you join Crusoe, you join a team that is building the future, faster. We're in the midst of the greatest industrial revolution of our time. The demand for AI compute is boundless, and power is a bottleneck. We're solving that — with an energy-first approach that makes AI infrastructure better for the world and faster for the people innovating with AI. We're looking for problem-solving...