MogiMogiJobsPowered by MobiusEngineLet Mogi apply

Experienced Professionals

Project Superintendent (night shift) - Data Center Construction

Temple, TX · 2 weeks ago

On-siteFull-time

$20 to $20 a hour

About the job

Job Summary
The Project Superintendent (PS) will work the night shift and plan, coordinate, and supervise the field and/or administrative operations of projects. They will provide technical direction and have responsibility for the safety, costs, productivity, profitability, and overall quality of the work (including self-performed work) for the project(s). The PS will establish productivity goals and measure performance as well as schedule labor, materials, and equipment, including the work of subcontractors and may supervise one or more field superintendents. This position includes several 'steps', which provide for a progression of skill and experience. • Project Superintendent I is
capable of less complex projects of $20 million and under with typically 3-5 years' experience in this position. • Project Superintendent II is capable of medium scale projects of $20-$50 million in size with typically 5-10 years' experience.
Key Responsibilities
1. Assists in the review of shop drawings, submittals, subcontract change orders and purchase orders.
2. Collaborates with the Project Manager to develop the project management plan (PMP) including the project scope management plan, procurement plan, environmental plan, time management plan, financial plan, quality management and safety plans and risk management process.
3. Conducts weekly coordination meetings with project teams and subcontractors and prepares daily field status reports.
4. Coordinates the documentation of constructability issues, potential design conflicts and clarifications with the appropriate personnel.
5. Develops and manages the construction plan for the successful execution of the work performed.
6. Ensures work is executed according to contract terms and conditions in a profitable manner.
7. Interacts effectively with owners, teams and other stakeholders to maintain a positive project environment and exceptional client experience.
8. Manages field operations. Is responsible for project success, including profitability, safety, schedule, quality and customer satisfaction.
9. Prepares and updates the original CPM Project Schedule and ensures the schedule is kept current to manage the project appropriately while utilizing LEAN processes and Weekly Work Plans.
10. Prevents claims, identify potential claims, quantify, document, mitigate/resolve the effects of those that do occur on a timely basis.
11. Provides leadership and guidance to assigned project team members and subcontractors. Plans, reviews, develops and manages the project team to ensure relentless execution of the project.
12. Responsible for the development and implementation of the Project Quality Management and Safety plans according to Sundt standards as part of the project management plan (PMP).
13. Responsible for the timely completion of all punch lists and develops a schedule as required by the owner for the successful start-up and commissioning of all systems.
Minimum Job Requirements
1. Excellent communication, organizational, and supervisory skills are essential.
2. Four-year engineering degree or equivalent combinations of technical training and/or related experience
required.
3. Must have a thorough knowledge of all aspects of construction (technology, equipment, and methods), negotiations, engineering, cost control, scheduling, and safety.
4. Must have construction project and supervision experience in similar types of facilities.
Note: Job Description is subject to change at any time and may include other duties as assigned.
Physical Requirements
1. Ability to wear personal protective equipment is required (including but not limited to; steel toed shoes, gloves, safety glasses, hearing protection, hardhat, vest, etc.)
2. May reach above shoulder heights and below the waist on a frequent basis
3. May stoop, kneel, or bend, on an occasional basis
4. May use telephone, computer system, email, or other electronic devices on a limited basis to communicate with internal and external customers or vendors
5. Must be able to comply with all safety standards and procedures
6. Occasionally will climb stairs, ladders, etc.
7. Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis
8. Will interact with people frequently during a shift/work day
9. Will lift, push or pull objects on an occasional basis
10. Will sit, stand or walk short distances for up to the entire duration of a shift/work day.
Safety Level
Safety-Sensitive
Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.
#LI-HW1